连云港贾忻集团有限责任公司

Location: Home > Saccharify > Reconstruction Of Energy Coordination In Factory
Saccharify

The new energy production plan supply device in the beer production process is the new patent technology used by Qingdao Deemann. It uses the biomass fuel boiler as the heat source, with the aid of the absorption refrigeration technology using steam refrigeration, and the coordinated design of the whole plant energy to realize the coordination configuration of the cold heat source in the beer factory, and greatly save the beer factory. Energy consumption. The project was successfully applied to the brewing process of Qingdao Deemann beer workshop in 2012 and achieved remarkable energy saving effect.

彰武县| 夹江县| 原阳县| 临泽县| 巴彦淖尔市| 九龙坡区| 清新县| 奉贤区| 德安县| 阳原县| 宁南县| 澄迈县| 嘉善县| 庆城县| 中方县| 黄浦区| 崇阳县| 晋城| 新建县| 平果县| 资中县| 屏南县| 北流市| 阳朔县| 错那县| 宁晋县| 河北区| 栾城县| 平山县| 恭城| 乡城县| 永宁县| 梅州市| 绥化市| 红原县| 新丰县| 阳曲县| 东辽县| 微山县| 松滋市| 宣恩县|